Under Florida's enhanced nutrient-reducing (ENR) septic rules, most of Marion County is covered: new systems inside the Silver Springs and Rainbow Springs BMAP must reduce nitrogen on any lot size, and an existing system must be upgraded when it needs a repair, modification or replacement permit. A fully working system with no permit need does not have to change now. Whether your lot is covered depends on where the parcel sits, so confirm it on DEP's BMAP map.

The statewide ENR rule: lots of one acre or less
Florida's statewide rule, s. 403.067(7)(a)10, comes from HB 1379 (effective July 1, 2023). Inside a basin management action plan (BMAP) area, new systems are prohibited where public sewer is available. On lots of one acre or less where sewer is not available, the law requires an enhanced nutrient-reducing system or another system that achieves at least 65 percent nitrogen reduction. DEP says that since July 1, 2023, applicants for new systems on lots of one acre or less in impacted areas must install a nitrogen-reducing system.
Marion County is stricter: any lot size
Marion falls under the Silver Springs and Upper Silver River and Rainbow Spring Group and Rainbow River BMAP, which became final and effective on April 27, 2026. Its plan prohibits new systems on any lot size inside the BMAP boundary unless they are ENR or reach at least 65 percent nitrogen reduction. DEP's August 2026 table marks any lot size in the BMAP as requiring ENR as of July 27, 2026. The reason for that date was not found, so check with DEP if timing matters to your project.
Existing systems: the repair-permit trigger
The BMAP's rule for existing systems says that when you need a construction permit to repair, modify or replace a system, a DEP-approved ENR system must be installed, unless you document that sewer is planned and funded and the structures will connect. Typical triggers are a failed drain field, a broken tank or a storm-damage repair. Our post on signs a tank is full covers the warning signs. A routine pump-out is not a repair permit.
The long-term deadline
The plan says conventional systems must meet ENR requirements or connect to sewer no later than 20 years after adoption. Sources conflict on the calendar year (DEP lists 2038 as the plan's restoration target, and Alachua County says 2046), so plan around the 20-year wording and confirm with DEP.
Does your lot qualify? A quick check
- Find your parcel on DEP's BMAP map (floridadep.gov/BMAPs-ARP-OSTDS). Most of Marion County is inside the BMAP.
- Marion Oaks and the Fort McCoy town area appear to be mostly outside the BMAP, so the ENR repair rule likely does not apply to most homes there. Verify the exact address first.
- Is public sewer available or planned and funded at your address? That can change the answer.
- Does the project need a DEP permit for new, repair, modification or replacement work?
What ENR systems are and what they cost
Approved types are in-ground nitrogen-reducing biofilters, NSF 245-certified nitrogen-reducing aerobic treatment units, and nitrogen-reducing performance-based treatment systems. Aerobic units need a maintenance agreement with inspections at least twice a year and a DEP operating permit ($100 every two years). Florida Realtors puts an ENR system at approximately $15,000 to $35,000 or more (an estimate, not a quote); see the ENR system cost guide. In our October 2026 research we could not verify an open ENR rebate in Marion County; ask DEP for current status.
Why Marion has these rules
Silver Springs and Rainbow Springs are impaired by excess nitrate. The adopted 2025 BMAP attributes 32 percent of the nitrogen load to septic systems, tied with agriculture. The plan covers about 103,960 systems (FLWMI 2023), and about 100,000 septic systems are in Marion County.
Get a free quote for a septic system installation
Florida Septic Works connects Ocala and Marion County homeowners with independent local septic companies for free, no-obligation quotes. Florida Septic Works is a referral service, not a septic tank contractor; the work is done by independent DEP-registered septic tank contractors, who quote, contract and do the job. Read the ENR septic requirements guide, learn about septic system installation, or request a free quote. We usually reply the same day. This is general information, not legal advice.
Frequently asked questions
Do I have to upgrade my working septic system to ENR now?
Not if the system works and needs no permit. In the Silver Springs and Rainbow Springs BMAP, the existing-system rule applies when a DEP construction permit is needed to repair, modify or replace a system. A fully working system with no permit need does nothing now, though the plan sets a long-term deadline of about 20 years.
Does my lot size matter for ENR in Marion County?
For new systems, the Silver Springs and Rainbow Springs BMAP now requires ENR on any lot size inside the BMAP boundary. Statewide, the 2023 law covers lots of one acre or less where sewer is not available. For repairs, DEP says any lot size in the BMAP requires ENR. Check your parcel on DEP's BMAP map.
Is there money to help pay for an ENR system in Marion County?
We could not verify an open ENR rebate in Marion County in our October 2026 research. DEP's Septic Upgrade Incentive Program, which paid up to $10,000 to installers, stopped taking applications, and DEP says it is working with Marion on a county program. Ask DEP or the county for current status before you plan on funding.